Skip to guide content
DK Valet Help & SOPsOpen Operations
← All procedures

SOP 52 · Daily operations · 2026-10-12

Export the operations view

Export the loaded reporting period for selected authorized properties.

Web · Administrator / Supervisor

Before you start

Verify selected properties and the loaded reporting period. Calendar day, status and text filters do not narrow this export.

Open Portfolio operations > Export operations CSV

  1. Step 1 Choose the properties

    Open Property schedule and select the intended properties in the portfolio operations filter. Confirm the authorized scope.

  2. Step 2 Check the reporting period

    The export uses the full reporting period loaded by this page. Calendar date, Day/Week view, shift status and text search affect the screen but do not narrow the exported dataset.

  3. Step 3 Export

    Select Export operations CSV beside the saved-view controls. Wait for the download or read the export failure message.

    Export operations CSV uses the selected properties and full loaded reporting period.
    Export operations CSV uses the selected properties and full loaded reporting period. Application screenshot with training data. Select the picture to enlarge.
  4. Step 4 Verify the downloaded rows

    Open the CSV and check property and date values. Filter the file to the required dates if necessary. Share workforce information only with authorized recipients and preserve unknown and degraded labels.

Check your result

The CSV contains the selected properties across the loaded reporting period.

If something goes wrong

If the export fails, refresh the view and retry. Do not broaden the property scope to work around an access failure.